33 CFR §127.103
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)If the waterfront facility handling LNG is in a region subject to earthquakes, the piers and wharves must be designed to resist earthquake forces.
- (b)Substructures, except moorings and breasting dolphins, that support or are within 5 meters (16.4 feet) of any pipe or equipment containing LNG, or are within 15 meters (49.2 feet) of a loading flange, must—
- (c)LNG or LPG storage tanks must have the minimum volume necessary for—