33 CFR §127.1403
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each operator of a waterfront facility handling LHG must conduct a visual inspection for defects of each pressure relief device not capable of being tested.
- (b)The operator must conduct the inspection required by paragraph (a) of this section at least once each calendar year, with intervals between inspections not exceeding 15 months.