33 CFR §127.609
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each marine transfer area for LNG must have a dry chemical system that provides at least two dry chemical discharges to the area surrounding the loading arms, one of which must be—
- (b)The dry chemical system must have the capacity to supply simultaneously or sequentially each hose or monitor in the system for 45 seconds.
- (c)Each dry chemical hose station must have at least one length of hose that—