CFR › Title 33 › Part 149 › §149.41633 CFR §149.416Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗Copy linkEach natural gas deepwater port must be equipped with a dry chemical system that meets the requirements of § 127.609 of this chapter.