StacksVerified U.S. regulatory reference

33 CFR §150.720

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
The sound signal on each pumping platform complex must be operated whenever the visibility in any horizontal direction from the structure is less than 5 miles. If the platform is under construction, this requirement may be met by the use of a 2-second whistle blast, made every 20 seconds by a vessel moored at the platform.