33 CFR §154.740
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
Each facility operator shall maintain at the facility and make available for examination by the COTP:
- (a)A copy of the letter of intent for the facility;
- (b)The name of each person designated as a person in charge of transfer operations at the facility and certification that each person in charge has completed the training requirements of § 154.710 of this part;
- (c)The date and result of the most recent test or examination of each item tested or examined under § 156.170 of this chapter;
- (d)The hose information required by § 154.500 (e) and (g) except that marked on the hose;
- (e)The record of all examinations of the facility by the COTP within the last 3 years;
- (f)The Declaration of Inspection required by § 156.150(f) of this chapter;
- (g)A record of all repairs made within the last three years involving any component of the facility's vapor control system required by subpart P of this part;
- (h)A record of all automatic shut downs of the facility's vapor control system within the last 3 years; and
- (i)Plans, calculations, and specifications of the facility's vapor control system certified under 33 CFR 154.2020 through 154.2025.
- (j)If they are not marked as such, documentation that the portable radio devices in use at the facility under § 154.560 of this part are intrinsically safe.