33 CFR §183.588
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
A fuel tank is tested by performing the following procedures in the following order:
- (a)Perform the static pressure test under § 183.580.
- (b)Perform the pressure impulse test under § 183.586.
- (c)Secure the tank to the platform of a tank rocker assembly.
- (d)Fill the tank to one-half capacity with water.
- (e)Cap and seal each opening in the tank.
- (f)Apply 500,000 cycles or rocking motion 15 degrees to each side of the tank centerline at the rate of 15 to 20 cycles a minute. The axis of rotation of the rocker and fuel tank must be perpendicular to the centerline of the tank length at a level six inches or less above or below the tank's bottom.
- (g)Perform the static pressure test under § 183.580.