36 CFR §9.90
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
If you are proposing production operations, you must submit the following information:
- (a)The dimensions with a to-scale layout of the wellpad, clearly identifying well locations, noting partial reclamation areas; gathering, separation, metering, and storage equipment; electrical lines; fences; spill control equipment or structures including lined areas, artificial lift equipment, tank batteries, treating and separating vessels, secondary or enhanced recovery facilities, water disposal facilities, gas compression and/or injection facilities; metering points; sales point (if on lease); tanker pick-up points; gas compressor, including size and type (if applicable); and any other well site equipment;
- (b)The size, grade, weight, and setting depth of all casing and tubing strings; cementing history; type and size of packers and subsurface flow control devices; top and bottom depths of each completed interval; and method of completion;
- (c)The well history, including completions, stimulations, servicing, and workovers;
- (d)The minimum specifications for pressure-control equipment, function, and pressure-testing frequency;
- (e)The methods and means to be used to transport produced oil and gas, including vehicular transport; flowline and gathering line construction; operation; pipe size; operating pressure; cathodic protection methods; surface equipment use; surface equipment location; maintenance procedures; maintenance schedules; pressure detection methods; and shutdown procedures;
- (f)Road and wellpad maintenance plan, including equipment and materials to maintain the road surface and control erosion;
- (g)Vegetation management plan on well sites, roads, pipeline corridors, and other disturbed surface areas, including control of exotic species;
- (h)Storm water management plan on the well site;
- (i)Produced water storage and disposal plan; and
- (j)The procedures for well plugging, the depths and the types of plugs, and minimum mud weight.