43 CFR §3175.117
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)On-line GCs must be installed, operated, and maintained under GPA 2166-05, Appendix D (incorporated by reference, see § 3175.30), and the manufacturer's specifications, instructions, and recommendations.
- (b)The GC must comply with the verification and calibration requirements of § 3175.118. The results of all verifications must be submitted to the AO upon request.
- (c)Upon request, the operator must submit to the AO the manufacturer's specifications and installation and operational recommendations.