43 CFR §3179.102
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The operator must maintain the following records for the period required under 43 CFR 3162.4-1(d) and make them available to the AO upon request:
- (1)For each inspection required under § 3179.100 of this subpart, documentation of:
- (2)The monitoring method(s) used to determine the presence of leaks;
- (3)A list of leak components on which leaks were found;
- (4)The date each leak was repaired; and
- (5)The date and result of the follow-up inspection(s) required under § 3179.101(c).
- (b)With the annual review and update of the LDAR program under § 3179.100(e) the operator must provide to the BLM state office an annual summary report on the previous year's inspection activities that includes:
- (c)AVO checks are not required to be documented unless they find a leak requiring repair.