43 CFR §3263.11
Send us a Sundry Notice with:
- (a)All the information required in the well completion report (see § 3264.10), unless we already have that information;
- (b)A detailed description of the proposed work, including:
- (1)Type, depth, length, and interval of plugs;
- (2)Methods you will use to verify the plugs (tagging, pressure testing, etc.);
- (3)Weight and viscosity of mud that you will use in the uncemented portions;
- (4)Perforating or removing casing; and
- (5)Restoring the surface; and
- (c)Any other information that we may require.