43 CFR §3275.11
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
You must:
- (a)Keep the facility in proper operating condition at all times by;
- (b)Base the design of the utilization facility siting and operation on sound engineering principles and other pertinent geologic and engineering data;
- (c)Prevent waste of, or damage to, geothermal and other energy and minerals resources; and
- (d)Comply with the requirements of § 3200.4.