43 CFR §3276.11
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Any drilling operations or changes made to a well;
- (b)Total production or injection in thousands of pounds (klbs);
- (c)Production or injection temperature in degrees Fahrenheit (deg. F);
- (d)Production or injection pressure in pounds per square inch (psi). You must also specify whether this is gauge pressure (psig) or absolute pressure (psia);
- (e)The number of days the well was producing or injecting;
- (f)The well status at the end of the month;
- (g)The amount of steam or hot water lost to venting or leakage, if the amount is greater than 0.5 percent of total lease production. We may modify this standard by a written order describing the change;
- (h)The lease number or unit name where the well is located;
- (i)The month and year to which the report applies;
- (j)Your name, title, signature, and a phone number where BLM may contact you; and
- (k)Any other information that we may require.