  1. (a)For all electrical generation facilities, include in your monthly report of facility operations:
    1. (1)Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each;
    2. (2)The temperature of the steam or hot water in deg. F;
    3. (3)The pressure of the steam or hot water in psi. You must also specify whether this is psig or psia;
    4. (4)Gross generation in kilowatt hours (kwh);
    5. (5)Net generation at the tailgate of the facility in kwh;
    6. (6)Temperature in deg. F and volume of the steam or hot water exiting the facility;
    7. (7)The number of hours the plant was on line;
    8. (8)A brief description of any outages; and
    9. (9)Any other information we may require.
  2. (b)For electrical generation facilities where Federal royalty is based on the sale of electricity to a utility, in addition to the information required under paragraph (a) of this section, you must include the following information in your monthly report of facility operations:
    1. (1)Amount of electricity delivered to the sales point in kwh, if the sales point is different from the tailgate of the facility;
    2. (2)Amount of electricity lost to transmission;
    3. (3)A report from the utility purchasing the electricity documenting the total number of kwh delivered to the sales point during the month, or monthly reporting period if it is not a calendar month, and the number of kwh delivered during diurnal and seasonal pricing periods; and
    4. (4)Any other information we may require.