StacksVerified U.S. regulatory reference

43 CFR §3276.13

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
In addition to the regular monthly report information required by § 3276.12, send to BLM:
  1. (a)Steam flow into the turbine in klbs; for dual flash facilities, you must separate the steam flow into high pressure steam and low pressure steam;
  2. (b)Condenser pressure in psia;
  3. (c)Condenser temperature in deg. F;
  4. (d)Auxiliary steam flow used for gas ejectors, steam seals, pumps, etc., in klbs;
  5. (e)Flow of condensate out of the plant (after the cooling towers) in klbs; and
  6. (f)Any other information we may require.