StacksVerified U.S. regulatory reference

43 CFR §3282.8

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
BLM will not approve a revision of the participating area boundary:
  1. (a)If the unit operator does not submit the required information;
  2. (b)If BLM determines that the new or additional technical information does not support a boundary revision; or
  3. (c)If it reduces the size of a participating area because of depletion of the resource.