43 CFR §3930.13
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Pit widths for each oil shale seam must be engineered and designed to eliminate or minimize the amount of oil shale fender to be left as a permanent pillar on the spoil side of the pit.
- (b)Considering mine economics and oil shale quality, the amount of oil shale wasted in each pit must be minimal.
- (c)The BLM must approve the final abandonment of a mining area.
- (d)The BLM must approve the conditions under which surface mines, or portions thereof, will be temporarily abandoned, under the regulations in this part.
- (e)The operator/lessee may, in the interest of conservation, mine oil shale up to the Federal lease or license boundary line, provided that the mining:
- (f)The operator must save topsoil for final application after the reshaping of disturbed areas has been completed.