StacksVerified U.S. regulatory reference

45 CFR §95.619

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
ADP systems designed, developed, or installed with FFP shall be used for a period of time specified in the advance planning document, unless the Department determines that a shorter period is justified.