47 CFR §32.2431
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)This account shall include the original cost of bare line wire and other material used in the construction of such plant.
- (b)The cost of permits and privileges for the construction of cable and wire facilities shall be included in the account chargeable with such construction.
- (c)The cost of drop and block wires served by aerial wire shall be included in Account 2421, Aerial Cable.