47 CFR §87.197
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
ELT testing must avoid outside radiation. Bench and ground tests conducted outside of an RF-shielded enclosure must be conducted with the ELT terminated into a dummy load.