49 CFR §1155.10
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
A petition to require a solid waste rail transfer facility in existence on October 16, 2008, to apply for a land-use-exemption permit, submitted by the Governor of the state or that Governor's designee, shall contain the following information:
- (a)The Governor's name.
- (b)The state's name and the name of any agency filing on behalf of the Governor.
- (c)The full address of the solid waste rail transfer facility, or, if not available, the city, state, and United States Postal Service ZIP code.
- (d)The name of the rail carrier that owns or operates the facility or the rail carrier on whose behalf the facility is operated.
- (e)A good-faith certification that the facility qualified as a solid waste rail transfer facility as defined in 49 U.S.C. 10908(e)(1)(H) and 49 CFR 1155.2, on October 16, 2008.
- (f)Relief sought (that the rail carrier that owns or operates the facility be required to apply for a land-use-exemption permit).
- (g)Name, title, and address of representative of petitioner to whom correspondence should be sent.