49 CFR §179.100-18
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each tank shall be tested by completely filling tank and manway nozzle with water or other liquid having similar viscosity, at a temperature which shall not exceed 100 °F during the test; and applying the pressure prescribed in § 179.101. The tank shall hold the prescribed pressure for at least 10 minutes without leakage or evidence of distress.
- (b)Insulated tanks shall be tested before insulation is applied.
- (c)Caulking of welded joints to stop leaks developed during the foregoing test is prohibited. Repairs in welded joints shall be made as prescribed in AAR Specifications for Tank Cars, appendix W (IBR, see § 171.7 of this subchapter).
- (d)Testing of exterior heaters is not a specification requirement.