49 CFR §179.500-3
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Tanks built under this specification shall be hollow forged or drawn in one piece. Forged tanks shall be machined inside and outside before ends are necked-down and, after necking-down, the ends shall be machined to size on the ends and outside diameter. Machining not necessary on inside or outside of seamless steel tubing, but required on ends after necking-down.
- (b)For tanks made in foreign countries, chemical analysis of material and all tests as specified must be carried out within the limits of the United States under supervision of a competent and disinterested inspector; in addition to which, provisions in § 179.500-18 (b) and (c) shall be carried out at the point of manufacture by a recognized inspection bureau with principal office in the United States.
- (c)The term “marked end” and “marked test pressure” used throughout this specification are defined as follows:
- (d)The gas pressure at 130 °F in the tank shall not exceed 7/10 of the marked test pressure of the tank.