49 CFR §192.369
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)Each service line connected to a cast iron or ductile iron main must be connected by a mechanical clamp, by drilling and tapping the main, or by another method meeting the requirements of § 192.273.
- (b)If a threaded tap is being inserted, the requirements of § 192.151 (b) and (c) must also be met.