Each weld that is unacceptable under § 192.241(c) must be repaired as follows:
- (a)If it is feasible to take the segment of transmission line out of service, the weld must be repaired in accordance with the applicable requirements of § 192.245.
- (b)A weld may be repaired in accordance with § 192.245 while the segment of transmission line is in service if:
- (c)A defective weld which cannot be repaired in accordance with paragraph (a) or (b) of this section must be repaired by installing a full encirclement welded split sleeve of appropriate design.