49 CFR §192.721
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The frequency of patrolling mains must be determined by the severity of the conditions which could cause failure or leakage, and the consequent hazards to public safety.
- (b)Mains in places or on structures where anticipated physical movement or external loading could cause failure or leakage must be patrolled—