49 CFR §193.2067
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)LNG facilities must be designed to withstand without loss of structural or functional integrity:
- (b)The wind forces at the location of the specific facility must be based on one of the following:
- (1)For shop fabricated containers of LNG or other hazardous fluids with a capacity of not more than 70,000 gallons, applicable wind load data in ASCE/SEI 7 (incorporated by reference, see § 193.2013).
- (2)For all other LNG facilities:
- (i)An assumed sustained wind velocity of not less than 150 miles per hour, unless the Administrator finds a lower velocity is justified by adequate supportive data; or
- (ii)The most critical combination of wind velocity and duration, with respect to the effect on the structure, having a probability of exceedance in a 50-year period of 0.5 percent or less, if adequate wind data are available and the probabilistic methodology is reliable.