49 CFR §195.266
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
A complete record that shows the following must be maintained by the operator involved for the life of each pipeline facility:
- (a)The total number of girth welds and the number nondestructively tested, including the number rejected and the disposition of each rejected weld.
- (b)The amount, location; and cover of each size of pipe installed.
- (c)The location of each crossing of another pipeline.
- (d)The location of each buried utility crossing.
- (e)The location of each overhead crossing.
- (f)The location of each valve and corrosion test station.