49 CFR §210.27
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)A railroad shall not operate a locomotive built after December 31, 1979, unless the locomotive has been certified to be in compliance with the Standards.
- (b)The certification prescribed in this section shall be determined for each locomotive model, by either—
- (c)If passby testing is used under paragraph (b)(2) of this section, it shall be conducted with the locomotive operating at maximum rated horsepower output.