49 CFR §229.303
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)The requirements of this subpart apply to all safety-critical electronic locomotive control systems, subsystems, and components (i.e., “products” as defined in § 229.305), except for the following:
- (1)Products that are fully developed prior to June 8, 2012.
- (2)Products that are under development as of October 9, 2012, and are fully developed prior to October 9, 2017.
- (3)Products that comingle locomotive control systems with safety critical processor based signal and train control systems;
- (4)Products that are used during on-track testing within a test facility; and
- (5)Products that are used during on-track testing outside a test facility, if approved by FRA. To obtain FRA approval of on-track testing outside of a test facility, a railroad shall submit a request to FRA that provides:
- (b)Railroads and vendors shall identify all products identified in paragraph (a)(2) of this section to FRA by February 9, 2013.
- (c)The exceptions provided in paragraph (a) of this section do not apply to products or product changes that result in degradation of safety, or a material increase in safety-critical functionality.