49 CFR §230.46
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
A metal badge plate showing the allowed steam pressure shall be attached to the boiler backhead in the cab. If boiler backhead is lagged, the lagging and jacket shall be cut away so that the plate can be seen.