StacksVerified U.S. regulatory reference

49 CFR §234.269

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
Each cut-out circuit shall be tested at least once every three months to determine that the circuit functions as intended. For purposes of this section, a cut-out circuit is any circuit which overrides the operation of automatic warning systems. This includes both switch cut-out circuits and devices which enable personnel to manually override the operation of automatic warning systems.