- (a)Before any field testing of an uncertified PTC system, or a product of an uncertified PTC system, or any regression testing of a certified PTC system is conducted on the general rail system, the railroad requesting the testing must provide:
- (1)A complete description of the PTC system;
- (2)An operational concepts document;
- (3)A complete description of the specific test procedures, including the measures that will be taken to protect trains and on-track equipment;
- (4)An analysis of the applicability of the requirements of subparts A through G of this part to the PTC system that will not apply during testing;
- (5)The date the proposed testing shall begin;
- (6)The test locations; and
- (7)The effect on the current method of operation the PTC system will or may have under test.
- (b)FRA may impose additional testing conditions that it believes may be necessary for the safety of train operations.
- (c)Relief from regulations other than from subparts A through G of this part that the railroad believes are necessary to support the field testing, must be requested in accordance with part 211 of this title.