49 CFR §611.207
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
- (a)[Reserved]
- (b)FTA will assign overall project ratings to each proposed project of “high,” “medium-high, “medium,” “medium-low,” or “low” as required by 49 U.S.C. 5309(g)(2)(A).
- (1)These ratings will indicate the overall merit of a proposed New Starts project at the time of evaluation.
- (2)Ratings for individual projects will be developed upon entry into engineering and prior to an FFGA. Additionally, ratings may be updated while a project is in engineering if the project scope and cost have changed materially since the most recent rating was assigned.
- (c)These ratings will be used to:
- (d)[Reserved]