StacksVerified U.S. regulatory reference

50 CFR §622.90

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)Dealer permits and conditions—(1) Permits. For a dealer to first receive Gulf red drum harvested in or from the EEZ, a Gulf and South Atlantic dealer permit must be issued to the dealer.
    1. (2)State license and facility requirements. To obtain a dealer permit, the applicant must have a valid state wholesaler's license in the state(s) where the dealer operates, if required by such state(s), and must have a physical facility at a fixed location in such state(s).
  2. (b)Permit procedures. See § 622.4 for information regarding general permit procedures including, but not limited to application, fees, duration, transfer, renewal, display, sanctions and denials, and replacement.