StacksVerified U.S. regulatory reference

50 CFR §86.59

Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov
  1. (a)In evaluating a proposed project under the criterion at § 86.51(c)(2), we consider if the project will include physical components, technology, or techniques that are:
    1. (1)Newly available; or
    2. (2)Repurposed in a unique way.
  2. (b)Examples of the type of innovations we will consider are components, technology, or techniques that:
    1. (1)Extend the useful life of the BIG-funded project;
    2. (2)Are designed to allow the operator to save costs, decrease maintenance, or improve operation;
    3. (3)Are designed to improve BIG-eligible services or amenities;
    4. (4)Reduce the carbon footprint of the BIG-funded facility. Carbon footprint means the impact of the total set of greenhouse gas emissions;
    5. (5)Are used during construction specifically to reduce negative environmental impacts, beyond compliance requirements; or
    6. (6)Improve facility resilience.