7 CFR §1753.79
Verified against eCFR.gov as of June 20, 2026View official text on eCFR.gov ↗
The borrower shall require that:
- (a)Minor construction by the force account method be supervised by a competent foreman. The work shall be performed in accordance with all regulatory and safety codes.
- (b)Daily time and material reports, referenced by the work project number, shall be kept to record labor and materials used as construction is performed.
- (c)The construction foreman shall maintain a tabulation of all construction units installed.