DOE will apply the method and criteria described in §§963.13 and 963.14 to evaluate the suitability of the Yucca Mountain site for the preclosure period. If DOE finds that the results of the preclosure safety evaluation conducted under §963.13 show that the Yucca Mountain site is likely to meet the applicable radiation protection standard, DOE may determine the site suitable for the preclosure period.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.