(a)
(b)
(1) procurement of each item of equipment to be procured for each reserve component; and
(2) each military construction project to be carried out for each reserve component, together with the location of the project.
(c)
(2) In this subsection, the term "average authorized amount", with respect to a fiscal year, means the average of—
(A) the aggregate of the amounts authorized to be appropriated for the preceding fiscal year for the procurement of items of equipment, and for military construction, for the reserve components; and
(B) the aggregate of the amounts authorized to be appropriated for the fiscal year preceding the fiscal year referred to in subparagraph (A) for the procurement of items of equipment, and for military construction, for the reserve components.
(3) A report required under paragraph (1) for a fiscal year shall be submitted not later than 90 days after the date on which the President submits to Congress the budget for such fiscal year under section 1105(a) of title 31.
Amendments
2011—Subsec. (c)(3). Pub. L. 112–81 substituted "90 days" for "15 days".
2000—Subsec. (c)(3). Pub. L. 106–398 added par. (3).
1997—Pub. L. 105–85 designated existing provisions as subsec. (a), inserted heading, and added subsecs. (b) and (c).
Effective Date
Pub. L. 104–201, div. A, title XII, §1257(b), Sept. 23, 1996, 110 Stat. 2699, provided that: "Section 10543 of title 10, United States Code, as added by subsection (a), shall apply with respect to each future-years defense program submitted to Congress after the date of the enactment of this Act [Sept. 23, 1996]."
Termination of Reporting Requirements
For termination, effective Dec. 31, 2021, of provisions of this section requiring submittal of report to Congress, see section 1061 of Pub. L. 114–328, set out as a note under section 111 of this title.
Required Level of Detail
Pub. L. 105–85, div. A, title X, §1009(b), Nov. 18, 1997, 111 Stat. 1872, provided that: "The level of detail provided for procurement and military construction in the future-years defense programs for fiscal years after fiscal year 1998 may not be less than the level of detail provided for procurement and military construction in the future-years defense program for fiscal year 1998."