(a)
(2) The program, to be known as the Defense Acquisition Challenge Program (hereinafter in this section referred to as the "Challenge Program"), shall provide any person or activity within or outside the Department of Defense with the opportunity to propose alternatives, to be known as challenge proposals, at the component, subsystem, system, or system-of-systems level of an existing Department of Defense acquisition program, or to address any broader functional challenge to Department of Defense missions that may not fall within an acquisition program, that would result in improvements in performance, affordability, manufacturability, or operational capability of that acquisition program or function.
(b)
(c)
(2) The Under Secretary shall establish procedures pursuant to which appropriate officials of the Department of Defense may identify proposals submitted through the unsolicited proposal process as challenge proposals. The procedures shall provide for the expeditious referral of such proposals to a Panel for preliminary evaluation under this subsection.
(3) The Under Secretary shall issue on an annual basis not less than one such broad agency announcement inviting interested parties to submit challenge proposals. Such announcements may also identify particular technology areas and acquisition programs or functions that will be given priority in the evaluation of challenge proposals.
(4)
(A) The Under Secretary shall establish procedures for the prompt issuance of a solicitation for challenge proposals addressing—
(i) any acquisition program for which, since the last such announcement, the Secretary concerned has determined under section 4374 of this title that the program's acquisition unit cost or procurement unit cost has increased by a percentage equal to or greater than the critical cost growth threshold for the program (in this section referred to as a "critical cost growth threshold breach");
(ii) any design, engineering, manufacturing, or technology integration issues, in accordance with the assessment required by section 4375(b) of this title, that have contributed significantly to the cost growth of such program; and
(iii) any functional challenges of importance to Department of Defense missions.
(B) A solicitation under this paragraph may be included in a broad agency announcement issued pursuant to paragraph (3) as long as the broad agency announcement is released in an expeditious manner following the determination of the Secretary concerned that a critical cost growth threshold breach has occurred with respect to a major defense acquisition program.
(5) Under procedures established by the Under Secretary, a Panel shall carry out a preliminary evaluation of each challenge proposal submitted in response to a broad agency announcement, or submitted through the unsolicited proposal process and identified as a challenge proposal in accordance with paragraph (2), to determine each of the following:
(A) Whether the challenge proposal has merit.
(B) Whether the challenge proposal is likely to result in improvements in performance, affordability, manufacturability, or operational capability at the component, subsystem, system, or system-of-systems level of an acquisition program.
(C) Whether the challenge proposal could be implemented in the acquisition program rapidly, at an acceptable cost, and without unacceptable disruption to the acquisition program.
(D) Whether the challenge proposal is likely to result in improvements to any functional challenges of importance to Department of Defense missions, and whether the proposal could be implemented rapidly, at an acceptable cost, and without unacceptable disruption to such missions.
(6) The Under Secretary—
(A) may establish procedures to ensure that the Challenge Program does not become an avenue for the repetitive submission of proposals that have been previously reviewed and found not to have merit; and
(B) may establish procedures to ensure that the Challenge Program establishes appropriate priorities for proposals from businesses that are not major contractors with the Department of Defense.
(7) If a Panel determines that a challenge proposal satisfies each of the criteria specified in paragraph (5), the person or activity submitting that challenge proposal shall be provided an opportunity to submit such challenge proposal for a full review and evaluation under subsection (d).
(d)
(2) The full review and evaluation shall, independent of the determination of a Panel under subsection (c)(5), determine each of the matters specified in subparagraphs (A), (B), and (C) of such subsection. The full review and evaluation shall also include—
(A) an assessment of the cost of adopting the challenge proposal and implementing it in the acquisition program; and
(B) consideration of any intellectual property issues associated with the challenge proposal.
(e)
(2) The Under Secretary shall encourage the adoption of each challenge proposal referred to in paragraph (1) by providing suitable incentives to the office carrying out the acquisition program and the prime system contractor carrying out such program.
(3) In the case of a challenge proposal submitted in response to a solicitation issued as a result of a critical cost growth threshold breach that is determined under full review and evaluation to satisfy each of the criteria specified in subsection (c)(5), the Under Secretary shall establish guidelines for covering the costs of the challenge proposal. If appropriate, such guidelines shall not be restricted to funding provided by the Defense Acquisition Challenge Program, but shall also consider alternative funding sources, such as the acquisition program with respect to which the breach occurred.
(f)
(1) The office carrying out the full review and evaluation shall provide to the Panel that conducted the preliminary evaluation a statement containing a summary of the rationale for the unfavorable evaluation.
(2) If the Panel disagrees with the rationale provided under paragraph (1), the Panel may return the challenge proposal to the office for further consideration.
(g)
(2) Funds available to carry out this program may be used to compensate such laboratories, centers, activities, and elements for technical assistance provided to a Panel pursuant to paragraph (1).
(h)
(i)
(j)
(k)
(1) means—
(A) the organization of hardware, software, material, facilities, personnel, data, and services needed to perform a designated function with specified results (such as the gathering of specified data, its processing, and its delivery to users); or
(B) a combination of two or more interrelated pieces (or sets) of equipment arranged in a functional package to perform an operational function or to satisfy a requirement; and
(2) includes a major system.
(l)
(1)
(2)
(A) is evaluated as achieving a level of performance that is at least equal to the level of performance of an item being procured under a covered acquisition program and as providing savings in excess of 15 percent after considering all costs to the Government of implementing such proposal; or
(B) is evaluated as achieving a level of performance that is significantly better than the level of performance of an item being procured under a covered acquisition program without any increase in cost to the Government.
(3)
(4)
(A)
(B)
(C)
(5)
Editorial Notes
References in Text
The Small Business Act, referred to in subsec. (l)(4)(B), is Pub. L. 85–536, §2(1 et seq.), July 18, 1958, 72 Stat. 384, which is classified generally to chapter 14A (§631 et seq.) of Title 15, Commerce and Trade. For complete classification of this Act to the Code, see Short Title note set out under section 631 of Title 15 and Tables.
Amendments
2021—Pub. L. 116–283, §1842(b), as amended by Pub. L. 117–81, §1701(q)(1), (u)(3)(B), renumbered section 2359b of this title as this section.
Subsec. (c)(4)(A)(i). Pub. L. 117–81, §1701(d)(9)(A)(i), which directed the substitution of "section 4374" for "section 2433(d)", could not be executed because of the intervening amendment by Pub. L. 116–283, §1883(b)(2). See note below.
Pub. L. 116–283, §1883(b)(2), substituted "section 4374" for "section 2433(d)".
Subsec. (c)(4)(A)(ii). Pub. L. 117–81, §1701(d)(9)(A)(ii), substituted "section 4375(b)" for "section 2433(e)(2)(A)".
Pub. L. 116–283, §1883(b)(2), which directed that each reference in the text of title 10 to a section that was redesignated by title XVIII of Pub. L. 116–283, as such section was in effect before the redesignation, be amended by striking such reference and inserting a reference to the appropriate redesignated section, could not be executed for "section 2433(e)(2)(A)" as there were no subparagraphs in subsec. (e)(2) of former section 2433 of this title after general amendment by Pub. L. 111–23, title II, §206(a)(3), May 22, 2009, 123 Stat. 1728. Section 2433(e)(2) was transferred to section 4375(b) of this title by Pub. L. 116–283.
Subsec. (j). Pub. L. 117–81, §1701(d)(9)(B), substituted "sections 3201 through 3205" for "chapter 137".
Subsec. (k)(2). Pub. L. 117–81, §1701(d)(9)(C), which directed that "(as defined in section 2302(5) of this title)" be struck out, was executed by striking out "(as defined in section 3041 of this title)" before period at end to reflect the probable intent of Congress and the intervening amendment by Pub. L. 116–283, §1883(b)(2). See note below.
Pub. L. 116–283, §1883(b)(2), substituted "section 3041" for "section 2302(5)".
2019—Subsecs. (a)(1), (l)(1). Pub. L. 116–92 substituted "Under Secretary of Defense for Research and Engineering" for "Under Secretary of Defense for Acquisition, Technology, and Logistics".
2016—Subsec. (a)(2). Pub. L. 114–328, §828(a), substituted "system, or system-of-systems level of an existing Department of Defense acquisition program, or to address any broader functional challenge to Department of Defense missions that may not fall within an acquisition program, that would result in improvements in performance, affordability, manufacturability, or operational capability of that acquisition program or function." for "or system level of an existing Department of Defense acquisition program that would result in improvements in performance, affordability, manufacturability, or operational capability of that acquisition program."
Subsec. (c)(3). Pub. L. 114–328, §828(d)(1), inserted "or functions" after "acquisition programs".
Subsec. (c)(4)(A)(iii). Pub. L. 114–328, §828(d)(2), added cl. (iii).
Subsec. (c)(5)(B). Pub. L. 114–328, §828(d)(4), substituted "system, or system-of-systems" for "or system".
Subsec. (c)(5)(D). Pub. L. 114–328, §828(d)(3), added subpar. (D).
Subsec. (e)(1). Pub. L. 114–328, §828(d)(4), substituted "system, or system-of-systems" for "or system".
Subsec. (j). Pub. L. 114–328, §828(b)(2), added subsec. (j). Former subsec. (j) redesignated (k).
Subsecs. (k), (l). Pub. L. 114–328, §828(b)(1), redesignated subsecs. (j) and (k) as (k) and (l), respectively.
Subsec. (l)(5). Pub. L. 114–328, §828(c), substituted "2021" for "2016".
2014—Subsec. (k)(4)(A). Pub. L. 113–291 substituted "section 110 of title 41" for "section 4 of the Office of Federal Procurement Policy Act (41 U.S.C. 403)".
2013—Subsec. (k)(4)(B). Pub. L. 113–66 inserted period at end.
Subsec. (k)(5). Pub. L. 112–239 substituted "January 7, 2016" for "the date that is five years after the date of the enactment of this Act".
2011—Subsecs. (j) to (l). Pub. L. 111–383 redesignated subsec. (l) as (j), added subsec. (k), and struck out former subsecs. (j) and (k) which related to annual report and termination of authority, respectively.
2008—Subsec. (l). Pub. L. 110–417 added subsec. (l).
2006—Subsec. (c)(4), (5). Pub. L. 109–364, §213(b)(1), added par. (4) and redesignated former par. (4) as (5). Former par. (5) redesignated (6).
Subsec. (c)(6). Pub. L. 109–364, §213(b)(1)(A), (d), redesignated par. (5) as (6) and amended it generally. Prior to amendment, par. (6) read as follows: "The Under Secretary may establish procedures to ensure that the Challenge Program does not become an avenue for the repetitive submission of proposals that have been previously reviewed and found not to have merit." Former par. (6) redesignated (7).
Subsec. (c)(7). Pub. L. 109–364, §213(b)(1)(A), (g)(1), redesignated par. (6) as (7) and substituted "paragraph (5)" for "paragraph (4)".
Subsec. (d)(1). Pub. L. 109–364, §213(g)(2), substituted "subsection (c)(7)" for "subsection (c)(6)".
Subsec. (d)(2). Pub. L. 109–364, §213(g)(3), substituted "subsection (c)(5)" for "subsection (c)(4)" in introductory provisions.
Subsec. (e)(1). Pub. L. 109–364, §213(g)(4), substituted "subsection (c)(5)" for "subsection (c)(4)".
Subsec. (e)(3). Pub. L. 109–364, §213(b)(2), added par. (3).
Subsecs. (f), (g). Pub. L. 109–364, §213(b)(3), added subsec. (f) and redesignated former subsec. (f) as (g). Former subsec. (g) redesignated (h).
Subsec. (h). Pub. L. 109–364, §213(b)(3)(A), (e), redesignated subsec. (g) as (h), substituted "Conflicts of Interest and Confidentiality" for "Elimination of Conflicts of Interest" in heading, substituted "conflicts of interest and that the identity of any person or activity submitting a challenge proposal is not disclosed outside the Federal Government, prior to contract award, without the consent of the person or activity" for "conflicts of interest", and inserted at end "For purposes of the proceeding sentence, the term 'Federal Government' includes both employees of the Federal Government and employees of Federal Government contractors providing advisory and assistance services as described in part 37 of the Federal Acquisition Regulation." Former subsec. (h) redesignated (i).
Subsec. (i). Pub. L. 109–364, §213(b)(3)(A), redesignated subsec. (h) as (i). Former subsec. (i) redesignated (j).
Subsec. (j). Pub. L. 109–364, §213(b)(3)(A), (4), redesignated subsec. (i) as (j) and substituted "The report shall also include a list of each challenge proposal that was determined by a Panel to satisfy each of the criteria specified in subsection (c)(5), but was not determined under a full review and evaluation to satisfy such criteria, together with a detailed rationale for the Department's determination that such criteria were not satisfied" for "No report is required for a fiscal year in which the Challenge Program is not carried out". Former subsec. (j) redesignated (k).
Subsec. (k). Pub. L. 109–364, §213(b)(3)(A), (f), redesignated subsec. (j) as (k) and substituted "2012" for "2007".
Statutory Notes and Related Subsidiaries
Effective Date of 2021 Amendment
Amendment by section 1701(d)(9) of Pub. L. 117–81 to take effect immediately after the amendments made by title XVIII of Pub. L. 116–283 have taken effect, see section 1701(a)(3) of Pub. L. 117–81, set out in a note preceding section 3001 of this title and note below.
Amendment by section 1701(q)(1), (u)(3)(B) of Pub. L. 117–81 applicable as if included in the enactment of title XVIII of Pub. L. 116–283 as enacted, see section 1701(a)(2) of Pub. L. 117–81, set out in a note preceding section 3001 of this title and Effective Date note below.
Amendment by Pub. L. 116–283 effective Jan. 1, 2022, with additional provisions for delayed implementation and applicability of existing law, see section 1801(d) of Pub. L. 116–283, set out as a note preceding section 3001 of this title.