For each launch of an unguided suborbital launch vehicle flown with a wind weighting safety system, in addition to the other requirements in this subpart outlined in §417.201(c), the flight safety analysis must:

(a) Establish flight commit criteria and other launch safety rules that a launch operator must implement to control the risk to the public from potential adverse effects resulting from normal and malfunctioning flight;

(b) Establish any wind constraints under which launch may occur; and

(c) Include a wind weighting analysis that establishes the launcher azimuth and elevation settings that correct for the windcocking and wind-drift effects on the unguided suborbital launch vehicle.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.