16 USC § 539l-3
Loop trail study; authorization
through Pub. L. 116-344, except Pub. Ls. 116-260 and 116-283
USC

(a) Study
Not later than three years after funds are first made available for this purpose, the Secretary, in consultation with interested parties, shall complete a study of the suitability and feasibility of establishing, consistent with the purpose set forth in section 539l(a)(2) of this title, a loop trail for mechanized and other nonmotorized recreation connecting the trail designated as "Rogers Pass" and the trail designated as "Rollins Pass Road".

(b) Establishment
If the results of the study required by subsection (a) indicate that establishment of such a loop trail would be suitable and feasible, consistent with the purpose set forth in section 539l(a)(2) of this title, the Secretary shall establish the loop trail in a manner consistent with that purpose.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.