(a) During construction activities, TVA shall require that appropriate erosion and sediment control measures be utilized to prevent pollution of the waters of the reservoir.

(b) All material which accumulates behind sediment control structures must be removed from TVA land and placed at an upland site above the 100-year floodplain elevation or the Flood Risk Profile Elevation (whichever is applicable).

(c) Disturbed sites must be promptly stabilized with seeding, vegetative planting, erosion control netting, and/or mulch material.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.