(a) You must perform a casing diagnostic test within 30 days after first observing or imposing casing pressure according to the following table:

Open Table
If you have a .  .  . you must perform a casing diagnostic test if .  .  .
(1) fixed platform well, the casing pressure is greater than 100 psig.
(2) subsea well, the measurable casing pressure is greater than the external hydrostatic pressure plus 100 psig measured at the subsea wellhead.
(3) hybrid well, a riser or the production casing pressure is greater than 100 psig measured at the surface.

(b) You are exempt from performing a diagnostic pressure test for the production casing on a well operating under active gas lift.

[76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50894, Aug. 22, 2012]