(a) You must file a statement of production if your average worldwide daily production exceeded 1.6 million barrels for the prior production period, as determined using the method set forth in §556.514. Your statement of production must specify that you were chargeable with an average daily production in excess of 1.6 million barrels for the prior production period.

(b) The prior production periods are as follows:

Open Table
For the bidding period of The prior production period is the
preceding
(1) May through October July through December.
(2) November through April January through June.

(c) You must file the statement of production by the following deadlines:

Open Table
For the bidding period of You must file the statement by
(1) May through October March 17.
(2) November through April September 17.

(d) If you are required to file a statement of production, BOEM may require you to submit a detailed report of production.

(1) The detailed report of production must list crude oil, natural gas liquids, and natural gas produced worldwide from reservoirs during the prior production period, and therefore chargeable to the prior production period.

(i) The amount of crude oil chargeable to the prior production period will be established by measurement of volumes delivered at the point of custody transfer (e.g., from storage tanks to pipelines, trucks, tankers, or other media for transport to refineries or terminals), with adjustments for net differences between opening and closing inventories, and basic sediment and water.

(ii) The amount of natural gas liquids chargeable to the prior production period must include gas liquefied at surface separators, field facilities, or gas processing plants.

(iii) The amount of natural gas chargeable to the prior production period must include adjustments, where applicable, to reflect the volume of gas returned to natural reservoirs, and the reduction of volume resulting from the removal of natural gas liquids and non-hydrocarbon gases.

(2) You must submit the detailed report of production within 30 days after receiving BOEM's request.

(3) BOEM may inspect and copy any document, record of production, analysis, and other material to verify the accuracy of any earlier statement of production.

(e) If you submit a statement of production that misrepresents your chargeable production, the Department may cancel any lease awarded in reliance upon the statement.


Tried the LawStack mobile app?

Join thousands and try LawStack mobile for FREE today.

  • Carry the law offline, wherever you go.
  • Download CFR, USC, rules, and state law to your mobile device.