(a) Until BOEM releases your financial assurance under §585.534, you must compile, retain, and make available to BOEM representatives, within the time specified by BOEM, all of the following:
(1) The as-built drawings;
(2) The design assumptions and analyses;
(3) A summary of the fabrication and installation examination records;
(4) The inspection results from the inspections and assessments required by §§585.820 through 585.825; and
(5) Records of repairs not covered in the inspection report submitted under §585.824(b)(3).
(b) You must record and retain the original material test results of all primary structural materials during all stages of construction until BOEM releases your financial assurance under §585.534. Primary material is material that, should it fail, would lead to a significant reduction in facility safety, structural reliability, or operating capabilities. Items such as steel brackets, deck stiffeners and secondary braces or beams would not generally be considered primary structural members (or materials).
(c) You must provide BOEM with the location of these records in the certification statement, as required in §§585.701(c), 585.703(b), and 585.708(a)(5)(i).