(a) The applicant shall provide adequate soil survey information on those portions of the permit area to be affected by surface operations or facilities consisting of the following:
(1) A map delineating different soils;
(2) Soil identification;
(3) Soil description; and
(4) Present and potential productivity of existing soils.
(b) Where the applicant proposes to use selected overburden materials as a supplement or substitute for topsoil, the application shall provide results of the analyses, trials and tests required under 30 CFR 817.22.
[44 FR 15363, Mar. 13, 1979, as amended at 81 FR 93330, Dec. 20, 2016; 82 FR 54956, Nov. 17, 2017]