30 CFR Subpart K
Ground Control
July 29, 2020
§
77.1000
Highwalls, pits and spoil banks; plans
§
77.1012
Jackhammers; operation; safeguards
§
77.1013
Air drills; safeguards
§
77.1000-1
Filing of plan
§
77.1001
Stripping; loose material
§
77.1002
Box cuts; spoil material placement
§
77.1003
Benches
§
77.1004
Ground control; inspection and maintenance; general
§
77.1005
Scaling highwalls; general
§
77.1006
Highwalls; men working
§
77.1007
Drilling; general
§
77.1008
Relocation of drills; safeguards
§
77.1009
Drill; operation
§
77.1010
Collaring holes
§
77.1011
Drill holes; guarding