33 CFR § 117.271
Blackwater River
August 2, 2023
§ 117.271 Blackwater River.
The draw of the CSX Transportation Railroad bridge, mile 2.8 at Milton, shall open on signal; except that, from 8 p.m. to 4 a.m., the draw shall open on signal if at least eight hours notice is given.
[CGD 82–025, 49 FR 17452, Apr. 24, 1984, as amended by CGD8–86–06, 51 FR 29101, Aug. 14, 1986; USCG–2001–10881, 71 FR 70310, Dec. 4, 2006]