33 CFR § 117.469
Liberty Bayou
August 2, 2023
§ 117.469 Liberty Bayou.
The draw of the S433 Bridge, mile 2.0, at Slidell, shall open on signal, except that between 7 p.m. to 7 a.m., the draw shall open on signal if at least two hours notice is given.
[USCG–2007–0078, 73 FR 12886, Mar. 11, 2008]